Hire NowAccess equipment
Brian James 3717-35-2-12 Plant Trailer
Brian James 3717-35-2-12
Specifications
Full specifications
Grouped for quick scanning — a row appears once its figure is verified for this machine. The manufacturer spec sheet always takes precedence.
Machine & transport4 specs
- Manufacturer
- Brian James
- Model
- 3717-35-2-12
- Customer pickup
- Delivery only
- Delivery
- Quoted by suburb & access
Delivery, access and running
Pre-start checks, every day
Every Equip Hire machine is function-tested before delivery, and every operator still checks the machine before each shift. This is the baseline we use; the machine's own logbook and check sheet govern.
Walk around
- Tyres / tracks, wheels and structure: damage, cracks, leaks
- Scissor stack / boom, pins and hoses: no visible damage or hydraulic leaks
- Decals, capacity plate and rails in place; gates close properly
- Work area: overhead power lines, holes, slopes, other traffic
Power on
- Fuel level, engine oil and coolant
- Ground and platform controls both operate correctly
- Emergency stop and horn work from both stations
Function test
- Raise, lower and drive at low height before working
- Emergency lowering: know where it is and that it works
- Tilt / overload alarms not showing faults
Any fault: tag it out and call us on 0472 721 234. Do not operate a machine with a known fault. Based on manufacturer pre-start requirements and SafeWork NSW guidance.
Before it arrives
- Measure the route, not the door. Every gate, corridor and lift on the way to the work area: handles, hinges, bollards and stored materials all eat clearance.
- Confirm the floor. Ground-bearing slab is fine; suspended slabs, mezzanines and raised floors need the wheel loads checked against the floor rating.
- Clear the work zone. Overhead services, sprinkler heads and light fittings at working height; exclusion for people below.
- Delivery space. Room for the truck to stop and unload safely. Tell us about docks, driveways and height limits when you book.
Mistakes we see weekly
- Booking on ceiling height instead of the actual task height. Measure to the work, then add nothing "just in case".
- Quoting the nominal door size instead of the clear opening. An 820 mm door leaf are not 820 mm once the door stop is counted.
- Assuming the machine can cross "a bit of lawn". Wheeled machines rut turf and bog in soft ground; say so and we'll send tracks.
- Leaving induction and permit requirements to delivery morning. Shopping centres and managed sites need paperwork before the truck arrives.
Documents
You might also consider
- N/A
Trailers
Plant Trailer
Brian James Eco Plant 2
Brian James Eco Plant 2 plant trailer — the trailer we tow our compact scissor lifts on, available with an approved customer pickup.
Hire - 0.76 m
Combos
19ft Electric Scissor Lift + Eco Plant 2 Trailer Combo — LGMG S0607E II
A 19ft electric scissor lift and the Eco Plant 2 plant trailer to tow it, quoted as one booking for approved customer pickup.
More in this category
Planning guides
Get a quote for the Brian James 3717-35-2-12 Plant Trailer
Tell us the job, the dates and the suburb. We will quote the machine and delivery together.






